Valhalla High School Science Building
Project
Industry
Education
Scope
Ground Up
Ground-up construction of a science building for Grossmont Union High School District. Scope delivered:
- A two-story, 30,000 SF wood framed structure featuring 12 lecture laboratories, two science prep rooms, and is equipped with college-prep level equipment and facilities
- The building is designed to current District Standards as to performance capabilities, and per Education Code and Building codes (ADA compliance, Fire Life Safety, Structural)
- Site work included the demolition of existing structures and 67,000 SF of new improvements
- Underground utility infrastructure (wet & dry) utilities were removed, rerouted, installed consistent with the underground utilities infrastructure plan